Whole home remodeling in Greater Boston

One house, one plan, one team.

Boston KBA plans and manages whole-home renovations in Boston and Greater Boston. Kitchens, bathrooms, layouts, systems and finishes are designed and sequenced as one project instead of a series of disconnected jobs.

Open living and dining space with white walls and a modern fireplace

Design inspiration. Representative photograph, not a Boston KBA project.

Bright living room with a vaulted ceiling and tall windows

Our approach

Renovating a whole house is a different kind of project.

When several rooms change at once, the decisions connect. Moving a bathroom affects the plumbing below it. A new kitchen may need a larger electrical service. Opening walls is the right moment to add insulation, update wiring or improve heating and cooling.

We plan the whole house first: what changes, what stays, and in what order the work makes sense. Then we build a schedule that keeps trades moving and keeps decisions ahead of the work.

Many Greater Boston homes have been updated piece by piece over decades. A whole-home renovation is a chance to make the house work as one place again.

What is included

What a whole home renovation can include.

Every house is different. These are the areas a whole-home project commonly covers.

Layout and design

  • Floor plan changes and opened walls
  • Kitchen and bathroom redesign
  • Primary suite and closet planning
  • Mudrooms, laundry and storage
  • Selections across the whole house

Systems

  • Electrical service and wiring updates
  • Plumbing supply and drain replacement
  • Heating, cooling and ventilation upgrades
  • Insulation and air sealing
  • Lighting plans throughout

Finishes

  • Flooring throughout the house
  • Trim, doors and built-ins
  • Tile, cabinetry and countertops
  • Interior painting
  • Exterior updates where needed

Before you start

What shapes a whole home project.

  • Living arrangements

    Some homeowners stay in part of the house while work moves room by room. Others move out for the heaviest phases. We plan the sequence around what you choose.

  • Systems first

    Wiring, plumbing, heating and insulation are far easier to upgrade while walls are open. We look at them early so the house performs as well as it looks.

  • Older houses

    Plaster, balloon framing, knob and tube wiring and settled floors are common in older Greater Boston homes, and each needs to be handled correctly.

  • Lead and asbestos

    Homes built before 1978 may contain lead paint, and older materials can contain asbestos. Testing and proper handling are part of planning a responsible renovation.

  • Decisions and schedule

    A whole-home project involves hundreds of selections. We help you make them in order so materials arrive before the work that needs them.

Cost

What drives whole home cost.

A whole-home renovation is priced room by room and system by system. The project planner collects the basics so we can prepare a personalized estimate and talk through priorities.

Square footage and rooms
How much of the house changes is the biggest single factor.
Layout changes
Moving walls, kitchens and bathrooms adds structural, plumbing and electrical work.
Systems
Electrical service, plumbing, heating and cooling, and insulation upgrades.
Finish level
Cabinetry, tile, flooring and fixtures across the whole house.
Condition of the house
Hidden damage, outdated wiring or hazardous materials discovered during demolition.
Phasing
Working while you live in the house can extend the schedule and add protection costs.

Questions

Whole home remodeling questions

How much does a whole home renovation cost?

It depends on how much of the house changes, layout and system work, finish level and the condition of the house. Use the project planner to describe your home, and we will follow up with a personalized estimate.

Can we live in the house during a whole home remodel?

Sometimes. It depends on the scope and how the work can be phased. We will be honest about when it is practical and when moving out for part of the project makes more sense.

Where do we start?

With a conversation about what is not working in the house and what you want it to become. From there we look at the house, set priorities and build a plan before anything is priced in detail.

Can the work be done in phases?

Yes. Some homeowners renovate over several years. A whole-house plan done up front makes sure each phase fits the next one.

Should we update systems while we renovate?

Usually, yes. Electrical, plumbing, heating and insulation are much easier and less expensive to upgrade while walls and ceilings are open.

Plan the whole house, not just one room.

Tell us about your home and what you want to change. We will follow up to talk through priorities, scope and budget.